{"id":6863,"date":"2026-09-16T03:01:50","date_gmt":"2026-09-16T03:01:50","guid":{"rendered":"https:\/\/www.sutyo.com\/zagrebde-35-milyon-avroluk-gelisim-merkezi-projesinde-insaat-sureci-basliyor-2\/"},"modified":"2026-09-16T03:01:50","modified_gmt":"2026-09-16T03:01:50","slug":"zagrebde-35-milyon-avroluk-gelisim-merkezi-projesinde-insaat-sureci-basliyor-2","status":"publish","type":"post","link":"https:\/\/www.sutyo.com\/tr\/zagrebde-35-milyon-avroluk-gelisim-merkezi-projesinde-insaat-sureci-basliyor-2\/","title":{"rendered":"Zagreb\u2019De 35 Milyon Avroluk Geli\u015fim Merkezi Projesinde \u0130n\u015faat S\u00fcreci Ba\u015fl\u0131yor"},"content":{"rendered":"<div><span style=\"\">H\u0131<\/span><span style=\"\">rvatistan\u2019\u0131n ba\u015fkenti Zagreb\u2019de yakla\u015f\u0131k 20 y\u0131ld\u0131r g\u00fcndemde olan Oporovec Otizm Merkezi Projesi i\u00e7in yap\u0131 ruhsat\u0131 al\u0131nd\u0131. Projenin \u00f6n\u00fcndeki idari ve teknik engellerin a\u015f\u0131lmas\u0131yla birlikte merkezin in\u015faat\u0131n\u0131n ba\u015flamas\u0131n\u0131n \u00f6n\u00fc a\u00e7\u0131lm\u0131\u015ft\u0131r.<\/span><br \/>\nDubrava b\u00f6lgesindeki Oporovec\u2019te in\u015fa edilecek yeni merkezin 9.600 metrekareden fazla kapal\u0131 alana sahip olmas\u0131 ve yakla\u015f\u0131k 200 \u00e7ocu\u011fa 48 s\u0131n\u0131f ve e\u011fitim grubunda hizmet vermesi planlanmaktad\u0131r. Tesiste ayr\u0131ca y\u00fczme havuzu, spor salonlar\u0131, duyu park\u0131 ve terapi alanlar\u0131 bulunacakt\u0131r.<\/p>\n<p>Projenin toplam yat\u0131r\u0131m de\u011ferinin yakla\u015f\u0131k 35 milyon avro olmas\u0131 \u00f6ng\u00f6r\u00fclmektedir. Bunun 19,3 milyon avroluk k\u0131sm\u0131 H\u0131rvatistan Ulusal Toparlanma ve Dayan\u0131kl\u0131l\u0131k Plan\u0131 (NRRP) kapsam\u0131nda finanse edilirken, kalan tutar\u0131n Zagreb Belediyesi b\u00fct\u00e7esinden kar\u015f\u0131lanmas\u0131 planlanmaktad\u0131r.<\/p>\n<p>Projenin mimari tasar\u0131m\u0131 SODA-ARHITEKTI taraf\u0131ndan haz\u0131rlan\u0131rken, \u00fc\u00e7 katl\u0131 merkezin 60 ara\u00e7l\u0131k otoparka sahip olmas\u0131 ve dokuz park yerinin engelli bireyler i\u00e7in ayr\u0131lmas\u0131 planlanmaktad\u0131r.<\/p>\n<p>Merkezde okul \u00f6ncesi e\u011fitim gruplar\u0131n\u0131n yan\u0131 s\u0131ra m\u00fczik ve sanat terapisi, g\u00fcnl\u00fck ya\u015fam becerileri ve su terapisi i\u00e7in \u00f6zel alanlar, y\u00fczme havuzu, spor salonlar\u0131 ve otizm spektrum bozuklu\u011fu bulunan \u00e7ocuklar\u0131n ihtiya\u00e7lar\u0131na g\u00f6re tasarlanm\u0131\u015f di\u011fer e\u011fitim ve destek alanlar\u0131 yer alacakt\u0131r.<\/p>\n<p>\u0130n\u015faat\u0131n, proje belgelerinin tamamlanmas\u0131 ve y\u00fcklenicinin belirlenmesinin ard\u0131ndan 2027 yaz\u0131nda ba\u015flamas\u0131, \u00e7al\u0131\u015fmalar\u0131n ise yakla\u015f\u0131k 18 ayda tamamlanmas\u0131 planlanmaktad\u0131r.\u00a0<\/p>\n<p>\u00a0<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>H\u0131rvatistan\u2019\u0131n ba\u015fkenti Zagreb\u2019de yakla\u015f\u0131k 20 y\u0131ld\u0131r g\u00fcndemde olan Oporovec Otizm Merkezi Projesi i\u00e7in yap\u0131 ruhsat\u0131 al\u0131nd\u0131. Projenin \u00f6n\u00fcndeki idari ve teknik engellerin a\u015f\u0131lmas\u0131yla birlikte merkezin in\u015faat\u0131n\u0131n ba\u015flamas\u0131n\u0131n \u00f6n\u00fc a\u00e7\u0131lm\u0131\u015ft\u0131r. Dubrava b\u00f6lgesindeki Oporovec\u2019te in\u015fa edilecek yeni merkezin 9.600 metrekareden fazla kapal\u0131 alana sahip olmas\u0131 ve yakla\u015f\u0131k 200 \u00e7ocu\u011fa 48 s\u0131n\u0131f ve e\u011fitim grubunda hizmet vermesi planlanmaktad\u0131r. &hellip; <a href=\"https:\/\/www.sutyo.com\/tr\/zagrebde-35-milyon-avroluk-gelisim-merkezi-projesinde-insaat-sureci-basliyor-2\/\" class=\"more-link\">Okumaya devam et<span class=\"screen-reader-text\"> &#8220;Zagreb\u2019De 35 Milyon Avroluk Geli\u015fim Merkezi Projesinde \u0130n\u015faat S\u00fcreci Ba\u015fl\u0131yor&#8221;<\/span><\/a><\/p>","protected":false},"author":1271,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"categories":[393],"tags":[],"class_list":["post-6863","post","type-post","status-publish","format-standard","hentry","category-hayvancilik"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/posts\/6863","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/users\/1271"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/comments?post=6863"}],"version-history":[{"count":0,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/posts\/6863\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/media?parent=6863"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/categories?post=6863"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/tags?post=6863"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}