{"id":6357,"date":"2026-06-10T03:04:18","date_gmt":"2026-06-10T03:04:18","guid":{"rendered":"https:\/\/www.sutyo.com\/altyapi-bakanligi-ulke-genelindeki-yedi-buyuk-altyapi-projelerinin-ortalama-%91-tamamlanma-oranina-ulastigini-acikladi\/"},"modified":"2026-06-10T03:04:18","modified_gmt":"2026-06-10T03:04:18","slug":"altyapi-bakanligi-ulke-genelindeki-yedi-buyuk-altyapi-projelerinin-ortalama-%91-tamamlanma-oranina-ulastigini-acikladi","status":"publish","type":"post","link":"https:\/\/www.sutyo.com\/tr\/altyapi-bakanligi-ulke-genelindeki-yedi-buyuk-altyapi-projelerinin-ortalama-%91-tamamlanma-oranina-ulastigini-acikladi\/","title":{"rendered":"Altyap\u0131 Bakanl\u0131\u011f\u0131, \u00fclke genelindeki yedi b\u00fcy\u00fck altyap\u0131 projelerinin ortalama %91 tamamlanma oran\u0131na ula\u015ft\u0131\u011f\u0131n\u0131 a\u00e7\u0131klad\u0131"},"content":{"rendered":"<div>\n<p>The New Times, tamamlanmaya yak\u0131n <strong>yedi b\u00fcy\u00fck altyap\u0131 projesini<\/strong> \u00f6n plana \u00e7\u0131kard\u0131. Bu projeler yollar, sa\u011fl\u0131k tesisleri, limanlar, hidroelektrik santraller ve su projeleri gibi farkl\u0131 sekt\u00f6rleri kapsamaktad\u0131r.<\/p>\n<p><strong>1. Nyange-Muhanga Yolu<\/strong> <strong>24 kilometrelik<\/strong> Nyange-Muhanga yolundaki rehabilitasyon ve geni\u015fletme \u00e7al\u0131\u015fmalar\u0131 <strong>%91,5<\/strong> tamamlanma oran\u0131na ula\u015ft\u0131. Bu yol, Karongi-Muhanga g\u00fczergah\u0131n\u0131n bir b\u00f6l\u00fcm\u00fcn\u00fc olu\u015fturmaktad\u0131r. G\u00fczergah\u0131n di\u011fer kesimleri olan Rubengera\u2013Rambura ve Rambura\u2013Nyange zaten tamamlanm\u0131\u015f durumdad\u0131r. Tamamland\u0131\u011f\u0131nda, bu modernize edilmi\u015f koridor <strong>G\u00fcney \u0130l&#8217;i Bat\u0131 ve Kuzey \u0130ller ile Kigali&#8217;ye<\/strong> ba\u011flayarak insan ve mal hareketini kolayla\u015ft\u0131racak.<\/p>\n<p><strong>2. Rusizi Liman\u0131<\/strong> <strong>Kivu G\u00f6l\u00fc<\/strong> k\u0131y\u0131s\u0131ndaki Rusizi Liman\u0131 <strong>%97<\/strong> tamamland\u0131. Proje, <strong>Rwanda ile Kongo Demokratik Cumhuriyeti<\/strong> aras\u0131ndaki ticaret ve ula\u015f\u0131m\u0131 kolayla\u015ft\u0131racak. Kivu G\u00f6l\u00fc&#8217;n\u00fcn g\u00fcney ucunda yer alan Rusizi, Bukavu \u015fehri ve KDC&#8217;nin G\u00fcney Kivu Eyaleti ile ticarette \u00f6nemli bir kap\u0131 konumundad\u0131r. Liman, y\u0131ll\u0131k <strong>2,3 milyon yolcuya<\/strong> hizmet verecek ve <strong>1,3 milyon ton kargo<\/strong> ta\u015f\u0131yacak kapasitede tasarland\u0131.<\/p>\n<p><strong>3. Masaka Hastanesi<\/strong> Kicukiro \u0130l\u00e7esi&#8217;ndeki Masaka Hastanesi&#8217;nin geni\u015fletme \u00e7al\u0131\u015fmalar\u0131 <strong>%100 tamamland\u0131<\/strong>. Tesis, Nyarugenge \u0130l\u00e7esi&#8217;nden ta\u015f\u0131nacak olan CHUK hastanesine ev sahipli\u011fi yapacak. <strong>830&#8217;dan fazla yatak kapasitesiyle<\/strong> yeni hastane, <strong>Rwanda&#8217;n\u0131n en b\u00fcy\u00fck genel ve \u00fcniversite e\u011fitim hastanesi<\/strong> olacak. Mevcut CHUK tesisinin <strong>400 yata\u011f\u0131<\/strong> bulunmaktad\u0131r. Yeni tesis, <strong>g\u00fcnde 2.000 hastaya<\/strong> kadar hizmet verebilecek kapasitede olacak. Ayr\u0131ca personel lojman\u0131 ve acil helikopterler i\u00e7in k\u00fc\u00e7\u00fck bir hava pisti de yer alacak.<\/p>\n<p><strong>4. Kigali Sulak Alan Rehabilitasyon Projesi<\/strong> Kigali&#8217;deki <strong>be\u015f sulak alan\u0131n<\/strong> rehabilitasyonu <strong>%94<\/strong> tamamland\u0131. Sulak alanlar \u015funlard\u0131r: <strong>Kibumba (68 hektar)<\/strong>, <strong>Nyabugogo (131 hektar)<\/strong>, <strong>Rugenge\u2013Rwintare (65 hektar)<\/strong>, <strong>Gikondo (162 hektar)<\/strong> ve <strong>Rwampara (65 hektar)<\/strong>.<\/p>\n<p><strong>5. Kivu Belt Su Projesi<\/strong> <strong>13 milyar Rwf<\/strong> de\u011ferindeki Kivu Belt su projesi <strong>%99<\/strong> tamamland\u0131. Projenin, Karongi \u0130l\u00e7esi&#8217;nde <strong>g\u00fcnde 13.000 metrek\u00fcp su<\/strong> \u00fcretmesi bekleniyor.<\/p>\n<p><strong>6. Muhazi Su Temin Projesi<\/strong> Muhazi su temin projesi <strong>%93<\/strong> tamamlanma oran\u0131na ula\u015ft\u0131. Projenin <strong>g\u00fcnde 12.000 metrek\u00fcp su<\/strong> \u00fcretmesi ve Do\u011fu \u0130l&#8217;indeki <strong>Kayonza ile Gatsibo il\u00e7elerine<\/strong> hizmet vermesi bekleniyor. Proje; Gatsibo \u0130l\u00e7esi&#8217;ndeki Kiramuruzi, Kiziguro, Murambi, Remera ve Rugarama ile Kayonza \u0130l\u00e7esi&#8217;ndeki Rukara, Gahini ve Murundi olmak \u00fczere <strong>sekiz sekt\u00f6rde<\/strong> temiz suya eri\u015fimi geni\u015fletmeyi hedefliyor. Proje tasar\u0131m\u0131na g\u00f6re tamamlanan sistem <strong>yakla\u015f\u0131k 543.000 ki\u015fiye<\/strong> hizmet verecek ve uzak mesafelerden su ta\u015f\u0131ma y\u00fck\u00fcn\u00fc \u00f6nemli \u00f6l\u00e7\u00fcde azaltacak. Proje kapsam\u0131nda <strong>256 kilometre su boru hatt\u0131<\/strong>, <strong>11 rezervuar<\/strong> ve <strong>165 halka a\u00e7\u0131k su noktas\u0131<\/strong> kurulacak.<\/p>\n<p><strong>7. Nyabarongo II Hidroelektrik Santrali<\/strong> Nyabarongo II Hidroelektrik Santrali, <strong>Rwanda H\u00fck\u00fcmeti<\/strong> ve <strong>\u00c7in \u0130hracat-\u0130thalat Bankas\u0131<\/strong> taraf\u0131ndan finanse edilen <strong>214 milyon dolarl\u0131k<\/strong> bir projedir. Rwanda Enerji Grubu&#8217;na (REG) g\u00f6re proje <strong>%69 tamamland\u0131<\/strong> ve tamamland\u0131\u011f\u0131nda <strong>43,5 MW elektrik<\/strong> \u00fcretmesi bekleniyor. H\u00fck\u00fcmet, <strong>2026\/2027 mali y\u0131l\u0131<\/strong> i\u00e7in projeye <strong>149,8 milyar Rwf<\/strong> tahsis etti. \u00c7ok ama\u00e7l\u0131 baraj <strong>59 metre y\u00fcksekli\u011finde<\/strong> ve <strong>363 metre uzunlu\u011funda<\/strong> olacak; <strong>803 milyon metrek\u00fcp<\/strong> depolama kapasitesine sahip bir rezervuar olu\u015fturacak. Baraj, Nyabarongo, Akagera ve Akanyaru nehirleri ile Bugesera&#8217;daki Cyohoha ve Rweru G\u00f6lleri \u00e7evresindeki sulama \u00e7al\u0131\u015fmalar\u0131n\u0131 destekleyecek. Ana bir kanal, Rulindo&#8217;daki Shyorongi&#8217;deki baraj sahas\u0131ndan suyu, b\u00fcy\u00fck \u00f6l\u00e7\u00fcde sulaman\u0131n ger\u00e7ekle\u015fece\u011fi <strong>Bugesera \u0130l\u00e7esi&#8217;ndeki<\/strong> tar\u0131m arazilerine ta\u015f\u0131yacak.<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>The New Times, tamamlanmaya yak\u0131n yedi b\u00fcy\u00fck altyap\u0131 projesini \u00f6n plana \u00e7\u0131kard\u0131. Bu projeler yollar, sa\u011fl\u0131k tesisleri, limanlar, hidroelektrik santraller ve su projeleri gibi farkl\u0131 sekt\u00f6rleri kapsamaktad\u0131r. 1. Nyange-Muhanga Yolu 24 kilometrelik Nyange-Muhanga yolundaki rehabilitasyon ve geni\u015fletme \u00e7al\u0131\u015fmalar\u0131 %91,5 tamamlanma oran\u0131na ula\u015ft\u0131. Bu yol, Karongi-Muhanga g\u00fczergah\u0131n\u0131n bir b\u00f6l\u00fcm\u00fcn\u00fc olu\u015fturmaktad\u0131r. G\u00fczergah\u0131n di\u011fer kesimleri olan Rubengera\u2013Rambura ve &hellip; <a href=\"https:\/\/www.sutyo.com\/tr\/altyapi-bakanligi-ulke-genelindeki-yedi-buyuk-altyapi-projelerinin-ortalama-%91-tamamlanma-oranina-ulastigini-acikladi\/\" class=\"more-link\">Okumaya devam et<span class=\"screen-reader-text\"> &#8220;Altyap\u0131 Bakanl\u0131\u011f\u0131, \u00fclke genelindeki yedi b\u00fcy\u00fck altyap\u0131 projelerinin ortalama %91 tamamlanma oran\u0131na ula\u015ft\u0131\u011f\u0131n\u0131 a\u00e7\u0131klad\u0131&#8221;<\/span><\/a><\/p>","protected":false},"author":1271,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"categories":[393],"tags":[],"class_list":["post-6357","post","type-post","status-publish","format-standard","hentry","category-hayvancilik"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/posts\/6357","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/users\/1271"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/comments?post=6357"}],"version-history":[{"count":0,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/posts\/6357\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/media?parent=6357"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/categories?post=6357"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/tags?post=6357"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}