{"id":6278,"date":"2026-06-03T03:02:23","date_gmt":"2026-06-03T03:02:23","guid":{"rendered":"https:\/\/www.sutyo.com\/nyabarongo-ii-baraji-icin-150-milyar-ruanda-frangi-tahsis-edildi\/"},"modified":"2026-06-03T03:02:23","modified_gmt":"2026-06-03T03:02:23","slug":"nyabarongo-ii-baraji-icin-150-milyar-ruanda-frangi-tahsis-edildi","status":"publish","type":"post","link":"https:\/\/www.sutyo.com\/tr\/nyabarongo-ii-baraji-icin-150-milyar-ruanda-frangi-tahsis-edildi\/","title":{"rendered":"Nyabarongo II Baraj\u0131 i\u00e7in 150 Milyar Ruanda Frang\u0131 Tahsis Edildi"},"content":{"rendered":"<div>\n<p>H\u00fck\u00fcmet, y\u00fczde 68 tamamlanma oran\u0131na ula\u015fan <strong>Nyabarongo II Hidroelektrik Santrali<\/strong>&#8216;nin in\u015faat\u0131 i\u00e7in <strong>2026\/2027 mali y\u0131l\u0131nda 149,8 milyar Ruanda Frang\u0131&#8217;ndan fazla<\/strong> \u00f6denek ay\u0131rd\u0131. Bu bilgi, <strong>Ruanda Enerji Grubu (REG)<\/strong> taraf\u0131ndan a\u00e7\u0131kland\u0131.<\/p>\n<p>REG Genel M\u00fcd\u00fcr\u00fc <strong>Armand Zingiro<\/strong>, in\u015faat faaliyetlerinin istikrarl\u0131 bir \u015fekilde ilerledi\u011fini ve projenin <strong>2027 y\u0131l\u0131 sonuna kadar<\/strong> enerji \u00fcretimine ba\u015flama hedefinde oldu\u011funu belirtti. Zingiro, The New Times&#8217;a \u015funlar\u0131 s\u00f6yledi: &#8220;Ana in\u015faat \u00e7al\u0131\u015fmalar\u0131n\u0131n <strong>Haziran 2027&#8217;ye kadar<\/strong> tamamlanmas\u0131n\u0131 bekliyoruz; ard\u0131ndan rezervuar doldurulacak ve test faaliyetleri ba\u015flayacak.&#8221;<\/p>\n<p>&#8220;<strong>Aral\u0131k 2027&#8217;de<\/strong> santralin elektrik \u00fcretmeye ba\u015flamas\u0131n\u0131 bekliyoruz. Gerekli ekipmanlar\u0131n b\u00fcy\u00fck \u00e7o\u011funlu\u011fu sahada mevcut olup ek ekipmanlar h\u00e2l\u00e2 ula\u015ft\u0131r\u0131lmaktad\u0131r.&#8221;<\/p>\n<p><strong>Nyabarongo Nehri<\/strong> \u00fczerinde kurulacak olan <strong>43,5 megavatl\u0131k \u00e7ok ama\u00e7l\u0131 hidroelektrik proje<\/strong>; elektrik \u00fcretiminin yan\u0131 s\u0131ra <strong>20.000 hektardan fazla tar\u0131m arazisini sulamay\u0131<\/strong>, su temini sa\u011flamay\u0131 ve mansap b\u00f6lgelerindeki <strong>ta\u015fk\u0131nlar\u0131 \u00f6nlemeyi<\/strong> hedeflemektedir. Proje, Rwanda ve \u00c7in h\u00fck\u00fcmetleri aras\u0131nda <strong>\u015eubat 2020&#8217;de<\/strong> imzalanan bir anla\u015fma kapsam\u0131nda finanse edilmekte olup <strong>\u00c7in \u0130thalat \u0130hracat Bankas\u0131<\/strong>, in\u015faat\u0131 finanse etmek i\u00e7in <strong>214 milyon dolar tutar\u0131nda imtiyazl\u0131 kredi<\/strong> sa\u011flamaktad\u0131r.<\/p>\n<p>Projenin toplam maliyetinin <strong>506 milyar Ruanda Frang\u0131&#8217;n\u0131 a\u015fmas\u0131<\/strong> \u00f6ng\u00f6r\u00fclmektedir. Bu tutar\u0131n i\u00e7inde <strong>M\u00fchendislik, Tedarik ve \u0130n\u015faat (EPC)<\/strong> i\u00e7in <strong>341 milyar Frank&#8217;tan fazlas\u0131<\/strong>, kamula\u015ft\u0131rma i\u00e7in <strong>152 milyar Frank&#8217;tan fazlas\u0131<\/strong> ve denetim faaliyetleri i\u00e7in <strong>11 milyar Frank&#8217;tan fazlas\u0131<\/strong> yer almaktad\u0131r. Projenin y\u00fcklenicisi <strong>\u00c7inli Sinohydro \u015firketi<\/strong>dir.<\/p>\n<p>Bug\u00fcne kadar projede <strong>204,7 milyar Ruanda Frang\u0131<\/strong> harcanm\u0131\u015f olup <strong>2026\/2027 mali y\u0131l\u0131<\/strong> i\u00e7in <strong>149,8 milyar Frank<\/strong> planlanmaktad\u0131r. <strong>Nyabarongo II<\/strong>, <strong>Kamonyi, Gakenke ve Rulindo<\/strong> il\u00e7elerinde in\u015fa edilmektedir.<\/p>\n<p>\u00c7ok ama\u00e7l\u0131 baraj <strong>59 metre y\u00fcksekli\u011fe<\/strong> ve <strong>363 metre uzunlu\u011fa<\/strong> sahip olacak; <strong>803 milyon metrek\u00fcp<\/strong> depolama kapasiteli bir rezervuar olu\u015fturacakt\u0131r.<\/p>\n<p><strong>Ruanda Tar\u0131m ve Hayvan Kaynaklar\u0131 Kurulu (RAB)<\/strong>&#8216;na g\u00f6re baraj, <strong>Nyabarongo, Akagera ve Akanyaru nehirleri<\/strong> ile <strong>Bugesera&#8217;daki Cyohoha ve Rweru g\u00f6lleri<\/strong> \u00e7evresindeki arazilerin sulanmas\u0131n\u0131 destekleyecektir.<\/p>\n<p><strong>Rulindo&#8217;daki Shyorongi<\/strong>&#8216;de yer alan baraj sahas\u0131ndan, sulaman\u0131n b\u00fcy\u00fck \u00f6l\u00e7\u00fcde ger\u00e7ekle\u015fmesinin beklendi\u011fi <strong>Bugesera \u0130l\u00e7esi<\/strong>&#8216;ndeki tar\u0131m arazilerine su ta\u015f\u0131yacak b\u00fcy\u00fck bir kanal in\u015fa edilecektir.<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>H\u00fck\u00fcmet, y\u00fczde 68 tamamlanma oran\u0131na ula\u015fan Nyabarongo II Hidroelektrik Santrali&#8216;nin in\u015faat\u0131 i\u00e7in 2026\/2027 mali y\u0131l\u0131nda 149,8 milyar Ruanda Frang\u0131&#8217;ndan fazla \u00f6denek ay\u0131rd\u0131. Bu bilgi, Ruanda Enerji Grubu (REG) taraf\u0131ndan a\u00e7\u0131kland\u0131. REG Genel M\u00fcd\u00fcr\u00fc Armand Zingiro, in\u015faat faaliyetlerinin istikrarl\u0131 bir \u015fekilde ilerledi\u011fini ve projenin 2027 y\u0131l\u0131 sonuna kadar enerji \u00fcretimine ba\u015flama hedefinde oldu\u011funu belirtti. Zingiro, The &hellip; <a href=\"https:\/\/www.sutyo.com\/tr\/nyabarongo-ii-baraji-icin-150-milyar-ruanda-frangi-tahsis-edildi\/\" class=\"more-link\">Okumaya devam et<span class=\"screen-reader-text\"> &#8220;Nyabarongo II Baraj\u0131 i\u00e7in 150 Milyar Ruanda Frang\u0131 Tahsis Edildi&#8221;<\/span><\/a><\/p>","protected":false},"author":1271,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"categories":[393],"tags":[],"class_list":["post-6278","post","type-post","status-publish","format-standard","hentry","category-hayvancilik"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/posts\/6278","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/users\/1271"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/comments?post=6278"}],"version-history":[{"count":0,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/posts\/6278\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/media?parent=6278"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/categories?post=6278"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/tags?post=6278"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}