{"id":5767,"date":"2026-02-11T03:02:34","date_gmt":"2026-02-11T03:02:34","guid":{"rendered":"https:\/\/www.sutyo.com\/monteput-2026-yili-icin-24-milyon-avroluk-kamu-ihale-plani-hazirladi-milyonlarca-avro-otoyollar-ve-adriyatik-iyonya-otoyolu-icin\/"},"modified":"2026-02-11T03:02:34","modified_gmt":"2026-02-11T03:02:34","slug":"monteput-2026-yili-icin-24-milyon-avroluk-kamu-ihale-plani-hazirladi-milyonlarca-avro-otoyollar-ve-adriyatik-iyonya-otoyolu-icin","status":"publish","type":"post","link":"https:\/\/www.sutyo.com\/tr\/monteput-2026-yili-icin-24-milyon-avroluk-kamu-ihale-plani-hazirladi-milyonlarca-avro-otoyollar-ve-adriyatik-iyonya-otoyolu-icin\/","title":{"rendered":"Monteput, 2026 Y\u0131l\u0131 \u0130\u00e7in 24 Milyon Avro&#8217;Luk Kamu \u0130hale Plan\u0131 Haz\u0131rlad\u0131: Milyonlarca Avro Otoyollar Ve Adriyatik-\u0130yonya Otoyolu \u0130\u00e7in"},"content":{"rendered":"<div>\n<p>Devlete ait \u015firket olan Monteput, KDV hari\u00e7 24.025.970 Avro, KDV dahil toplam de\u011feri ise 29 milyon Avro&#8217;yu a\u015fan 2026 y\u0131l\u0131 Kamu \u0130hale Plan\u0131&#8217;n\u0131 yay\u0131nlam\u0131\u015ft\u0131r. Fonlar\u0131n b\u00fcy\u00fck bir k\u0131sm\u0131, otoyollar\u0131n tasar\u0131m ve in\u015faat denetiminin yan\u0131 s\u0131ra Adriyatik-\u0130yonya Otoyolu i\u00e7in dok\u00fcmantasyon haz\u0131rlanmas\u0131na ili\u015fkindir.<\/p>\n<p>30 Ocak tarihinde yay\u0131nlanan plan, Karada\u011f b\u00fct\u00e7esi ve \u015firketin kendi fonlar\u0131ndan birle\u015fik finansman \u00f6ng\u00f6rmekte ve en yayg\u0131n model a\u00e7\u0131k kamu ihale prosed\u00fcrleri olacakt\u0131r.<\/p>\n<p>En b\u00fcy\u00fck kalemler, karayolu altyap\u0131s\u0131na y\u00f6nelik sermaye projelerini ifade etmektedir.<\/p>\n<p>Markovi\u0107i\u2013Lastva Grbaljska otoyolundaki \u00e7al\u0131\u015fmalar\u0131n y\u00fcr\u00fct\u00fclmesinin denetimi i\u00e7in 7 milyon Avro, otoyollar i\u00e7in \u00f6n tasar\u0131mlar\u0131n geli\u015ftirilmesi i\u00e7in ise 5,37 milyon Avro ayr\u0131lm\u0131\u015ft\u0131r.<\/p>\n<p>\u00d6zellikle Karada\u011f \u00fczerinden ge\u00e7ecek Adriyatik-\u0130yonya Otoyolu i\u00e7in \u00f6n tasar\u0131mlar\u0131n geli\u015ftirilmesine ayr\u0131lan 6,53 milyon Avro&#8217;luk kalem b\u00fcy\u00fck \u00f6nem ta\u015f\u0131makta ve bu da bu b\u00f6lgesel koridorun uygulanmas\u0131na y\u00f6nelik haz\u0131rl\u0131klar\u0131n yo\u011funla\u015ft\u0131r\u0131ld\u0131\u011f\u0131n\u0131 teyit etmektedir.<\/p>\n<p>Mate\u0161evo\u2013Andrijevica otoyolu ve Lastva Grbaljska\u2013Markovi\u0107i otoyolunun baz\u0131 b\u00f6l\u00fcmlerinin kontrol testleri i\u00e7in ek olarak 826 bin Avro ayr\u0131lm\u0131\u015ft\u0131r.<\/p>\n<p>Monteput ayr\u0131ca SCADA sisteminin bak\u0131m\u0131, gi\u015fe tahsilat yaz\u0131l\u0131m\u0131, video g\u00f6zetiminin geni\u015fletilmesi, Sozina t\u00fcnelinde yang\u0131n alg\u0131lama sens\u00f6r sistemleri ve telekom\u00fcnikasyon altyap\u0131s\u0131n\u0131n (TETRA sistemi) iyile\u015ftirilmesi de dahil olmak \u00fczere, gi\u015fe tahsilat\u0131 ve g\u00fcvenlik sisteminin modernizasyonuna yat\u0131r\u0131m yapmay\u0131 planlamaktad\u0131r.<\/p>\n<p>Plan ayr\u0131ca makina, ara\u00e7, sunucu ekipman\u0131, koruyucu ekipman ve elektrikli ara\u00e7 \u015farj cihazlar\u0131n\u0131n tedarikini de i\u00e7ermektedir.<\/p>\n<p>Kamu ihale plan\u0131, Bar-Boljare karayolunun Mate\u0161evo&#8217;dan Andrijevica&#8217;ya kadar olan ikinci b\u00f6l\u00fcm\u00fcn\u00fcn in\u015faat\u0131na ba\u015flanmas\u0131n\u0131n beklendi\u011fi y\u0131la denk gelmektedir.<\/p>\n<p>Bu b\u00f6l\u00fcm, halihaz\u0131rda in\u015fa edilmi\u015f olan Smokovac-Mate\u0161evo \u200b\u200bg\u00fczergah\u0131n\u0131n devam\u0131n\u0131 temsil etmekte ve \u00fclkenin kuzeyini Karada\u011f&#8217;\u0131n orta kesimiyle ba\u011flamak ve b\u00f6lgesel trafik yollar\u0131yla daha fazla entegrasyon sa\u011flamak a\u00e7\u0131s\u0131ndan stratejik \u00f6neme sahiptir.<\/p>\n<p>Mate\u0161evo&#8217;dan Andrijevica&#8217;ya kadar olan otoyolun ikinci b\u00f6l\u00fcm\u00fcn\u00fcn tasar\u0131m ve yap\u0131m ihalesinde Monteput, 693.969.668 Avro&#8217;luk teklifle \u201cPowerChina \u2013 Stecol \u2013 Pccd\u201d konsorsiyumunu se\u00e7mi\u015ftir.<\/p>\n<p>Monteput&#8217;un a\u00e7\u0131klad\u0131\u011f\u0131 \u00fczere, s\u00f6zle\u015fmenin imzalanmas\u0131n\u0131n ard\u0131ndan y\u00fcklenici bu altyap\u0131 projesinin uygulanmas\u0131 i\u00e7in tasar\u0131m ve haz\u0131rl\u0131k \u00e7al\u0131\u015fmalar\u0131na ba\u015flayacakt\u0131r.<\/p>\n<p>Ayn\u0131 zamanda, Adriyatik-\u0130yonya Otoyolu i\u00e7in \u00f6n tasar\u0131m \u00e7al\u0131\u015fmalar\u0131, devletin paralel olarak iki stratejik y\u00f6nde ilerledi\u011fini g\u00f6stermektedir: S\u0131rbistan s\u0131n\u0131r\u0131na do\u011fru kuzey kolunun tamamlanmas\u0131 ve Karada\u011f&#8217;\u0131 b\u00f6lgesel ula\u015f\u0131m yollar\u0131 haritas\u0131nda daha da konumland\u0131racak olan Adriyatik-\u0130yon koridorunun uzun vadeli haz\u0131rl\u0131\u011f\u0131d\u0131r.<\/p>\n<p>Plan\u0131n toplam de\u011feri ve yat\u0131r\u0131m yap\u0131s\u0131, 2026 y\u0131l\u0131n\u0131n karayolu altyap\u0131s\u0131 a\u00e7\u0131s\u0131ndan en yo\u011fun y\u0131llardan biri olaca\u011f\u0131n\u0131 g\u00f6stermektedir.<\/p>\n<p>\u00a0<\/p>\n<p>Kaynak: https:\/\/bankar.me\/clanci\/monteput-planira-24-miliona-eura-javnih-nabavki-u-2026-milioni-za-brze-saobracajnice-i-jadransko-jonski-autoput\/<\/p>\n<p>Yay\u0131mlayan: Podgoritsa Ticaret M\u00fc\u015favirli\u011fi<\/p>\n<p>\u00a0<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Devlete ait \u015firket olan Monteput, KDV hari\u00e7 24.025.970 Avro, KDV dahil toplam de\u011feri ise 29 milyon Avro&#8217;yu a\u015fan 2026 y\u0131l\u0131 Kamu \u0130hale Plan\u0131&#8217;n\u0131 yay\u0131nlam\u0131\u015ft\u0131r. Fonlar\u0131n b\u00fcy\u00fck bir k\u0131sm\u0131, otoyollar\u0131n tasar\u0131m ve in\u015faat denetiminin yan\u0131 s\u0131ra Adriyatik-\u0130yonya Otoyolu i\u00e7in dok\u00fcmantasyon haz\u0131rlanmas\u0131na ili\u015fkindir. 30 Ocak tarihinde yay\u0131nlanan plan, Karada\u011f b\u00fct\u00e7esi ve \u015firketin kendi fonlar\u0131ndan birle\u015fik finansman \u00f6ng\u00f6rmekte &hellip; <a href=\"https:\/\/www.sutyo.com\/tr\/monteput-2026-yili-icin-24-milyon-avroluk-kamu-ihale-plani-hazirladi-milyonlarca-avro-otoyollar-ve-adriyatik-iyonya-otoyolu-icin\/\" class=\"more-link\">Okumaya devam et<span class=\"screen-reader-text\"> &#8220;Monteput, 2026 Y\u0131l\u0131 \u0130\u00e7in 24 Milyon Avro&#8217;Luk Kamu \u0130hale Plan\u0131 Haz\u0131rlad\u0131: Milyonlarca Avro Otoyollar Ve Adriyatik-\u0130yonya Otoyolu \u0130\u00e7in&#8221;<\/span><\/a><\/p>","protected":false},"author":1271,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"categories":[393],"tags":[],"class_list":["post-5767","post","type-post","status-publish","format-standard","hentry","category-hayvancilik"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/posts\/5767","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/users\/1271"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/comments?post=5767"}],"version-history":[{"count":0,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/posts\/5767\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/media?parent=5767"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/categories?post=5767"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/tags?post=5767"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}