{"id":5245,"date":"2025-09-10T03:05:39","date_gmt":"2025-09-10T03:05:39","guid":{"rendered":"https:\/\/www.sutyo.com\/musanze-110-milyar-rwflik-atiktan-enerjiye-donusum-tesisi-hakkinda-bilinmesi-gereken-10-sey\/"},"modified":"2025-09-10T03:05:39","modified_gmt":"2025-09-10T03:05:39","slug":"musanze-110-milyar-rwflik-atiktan-enerjiye-donusum-tesisi-hakkinda-bilinmesi-gereken-10-sey","status":"publish","type":"post","link":"https:\/\/www.sutyo.com\/tr\/musanze-110-milyar-rwflik-atiktan-enerjiye-donusum-tesisi-hakkinda-bilinmesi-gereken-10-sey\/","title":{"rendered":"Musanze: 110 milyar Rwflik at\u0131ktan enerjiye d\u00f6n\u00fc\u015f\u00fcm tesisi hakk\u0131nda bilinmesi gereken 10 \u015fey"},"content":{"rendered":"<div>\n<p>Musanze B\u00f6lgesi\u2019nde m\u00fclk de\u011ferleme \u00e7al\u0131\u015fmalar\u0131 ba\u015flad\u0131. Bu, Rwanda\u2019n\u0131n ilk b\u00fcy\u00fck \u00f6l\u00e7ekli at\u0131ktan enerji \u00fcretim tesisi i\u00e7in yol a\u00e7\u0131yor. 80 milyon ABD dolar\u0131 (yakla\u015f\u0131k 115 milyar Rwf) de\u011ferindeki proje, \u00e7\u00f6pleri elektri\u011fe d\u00f6n\u00fc\u015ft\u00fcrmeyi, istihdam yaratmay\u0131 ve kirlili\u011fi azaltmay\u0131 hedefliyor. Proje, Waste Power Plant Ltd (WPP) taraf\u0131ndan uygulanacak ve ge\u00e7en hafta proje geli\u015ftiricileri, Musanze B\u00f6lgesi yetkilileri ve di\u011fer payda\u015flar aras\u0131nda tart\u0131\u015f\u0131ld\u0131.<\/p>\n<p>Musanze il\u00e7esi g\u00fcnde 84 ton at\u0131k \u00fcretiyor.<\/p>\n<p>Musanze B\u00f6lgesi \u0130cra Sekreteri Alex Kanayoge, halk\u0131 kamula\u015ft\u0131rma i\u00e7in m\u00fclk de\u011ferleme \u00e7al\u0131\u015fmalar\u0131na etkin \u015fekilde kat\u0131lmaya \u00e7a\u011f\u0131rd\u0131.Kanayoge, Musanze\u2019nin h\u0131zla b\u00fcy\u00fcyen bir \u015fehir oldu\u011funu ve belediye at\u0131klar\u0131na daha kolay eri\u015fim sa\u011fland\u0131\u011f\u0131n\u0131 belirtti.<\/p>\n<p>A\u015fa\u011f\u0131da proje hakk\u0131nda 10 \u00f6nemli bilgi yer al\u0131yor:<\/p>\n<p>1. G\u00fcnde 400 ton at\u0131k i\u015flenecek<\/p>\n<p>Kavumu at\u0131ktan enerji \u00fcretim tesisi g\u00fcnde 400 ton at\u0131\u011f\u0131 s\u00fcrekli olarak yakacak.Proje sera gaz\u0131 emisyonlar\u0131n\u0131 azaltmay\u0131 ve istihdam yaratmay\u0131 hedefliyor.Detayl\u0131 fizibilite \u00e7al\u0131\u015fmas\u0131n\u0131 Avustralya\u2019dan SMEC International Pty Ltd ger\u00e7ekle\u015ftirecek.Ama\u00e7, \u00fclkenin t\u00fcm b\u00fcy\u00fck \u015fehirlerinden at\u0131klar\u0131 yakarak \u00e7evreyi korumak ve \u015fehirleri temiz tutmak. Ayr\u0131ca Mpenge Nehri\u2019ndeki kirli suyun ar\u0131t\u0131larak kullan\u0131lmas\u0131na da katk\u0131 sa\u011flayacak.<\/p>\n<p>2. 15 MW elektrik \u00fcretimi<\/p>\n<p>Tesis, ulusal elektrik \u015febekesi i\u00e7in 15 MW enerji \u00fcretecek.Konumu, Mukungwa I ve II ile Rwaza-Muko gibi di\u011fer enerji santrallerine yak\u0131n oldu\u011fundan \u015febekeye ba\u011flanmas\u0131 kolay olacak.<\/p>\n<p>3. At\u0131ktan enerji \u00fcretim s\u00fcreci nas\u0131l i\u015fliyor?<\/p>\n<ul>\n<li>\n<p>Belediye kat\u0131 at\u0131klar\u0131 (MSW) evlerden, i\u015fletmelerden veya sanayiden toplan\u0131r.<\/p>\n<\/li>\n<li>\n<p>Yanmaz ve geri d\u00f6n\u00fc\u015ft\u00fcr\u00fclebilir maddeler (metal ve cam) ayr\u0131l\u0131r.<\/p>\n<\/li>\n<li>\n<p>Organik veya yan\u0131c\u0131 maddeler enerji \u00fcretimi i\u00e7in tutulur.<\/p>\n<\/li>\n<li>\n<p>At\u0131klar 850\u20131100\u00b0C s\u0131cakl\u0131kta yak\u0131l\u0131r.<\/p>\n<\/li>\n<li>\n<p>Yanma \u0131s\u0131s\u0131 suyu kaynat\u0131r ve buhar t\u00fcrbinleri \u00e7al\u0131\u015ft\u0131rarak elektrik \u00fcretir.<\/p>\n<\/li>\n<li>\n<p>Taban k\u00fcl\u00fc in\u015faat sekt\u00f6r\u00fcnde kullan\u0131labilir.<\/p>\n<\/li>\n<\/ul>\n<p>4. Maliyet<\/p>\n<p>Proje 30 ay i\u00e7inde uygulanacak ve toplam maliyeti 80 milyon ABD dolar\u0131 olacak.Musanze, h\u0131zl\u0131 b\u00fcy\u00fcmesi ve Kigali ile Rubavu gibi b\u00fcy\u00fck at\u0131k \u00fcreten \u015fehirler aras\u0131nda merkezi konumu nedeniyle se\u00e7ildi.Yat\u0131r\u0131m\u0131n geri d\u00f6n\u00fc\u015f\u00fc 8 y\u0131lda sa\u011flanacak ve y\u0131ll\u0131k 10 milyon ABD dolar\u0131 nakit ak\u0131\u015f\u0131 \u00f6ng\u00f6r\u00fcl\u00fcyor.<\/p>\n<p>5. K\u00fcl i\u015fleme alt fabrikas\u0131<\/p>\n<p>Tesis, k\u00fcl i\u015flemek i\u00e7in alt bir fabrikaya sahip olacak.Burada k\u00fcl; alkali-silika reaksiyonuna dayan\u0131kl\u0131 \u00e7imento, tar\u0131m i\u00e7in g\u00fcbre, ayr\u0131ca yol kaplama karosu gibi malzemelere d\u00f6n\u00fc\u015ft\u00fcr\u00fclecek.<\/p>\n<p>6. Proje a\u015famalar\u0131<\/p>\n<ul>\n<li>\n<p>Birinci a\u015fama: At\u0131k yakma ve 15 MW \u00fcretim.<\/p>\n<\/li>\n<li>\n<p>\u0130kinci a\u015fama: K\u00fcl i\u015fleme fabrikas\u0131 kurulumu.<\/p>\n<\/li>\n<li>\n<p>\u00dc\u00e7\u00fcnc\u00fc a\u015fama: Tesis kapasitesinin geni\u015fletilmesi.<\/p>\n<\/li>\n<\/ul>\n<p>7. 45 haneye tazminat<\/p>\n<p>Proje i\u00e7in 37 hektar alan ve 45 ev kamula\u015ft\u0131r\u0131lacak.<\/p>\n<p>8. 700\u2019den fazla ki\u015fiye istihdam<\/p>\n<p>Proje, 500\u2019den fazla kal\u0131c\u0131 i\u015f ve 200 ge\u00e7ici i\u015f yaratacak.<\/p>\n<p>9. E\u011fitim merkezi<\/p>\n<p>Tesis, yenilenebilir enerji ve at\u0131ktan enerji teknolojileri konusunda k\u0131ta \u00e7ap\u0131nda bir e\u011fitim merkezi kuracak.Di\u011fer \u00fclkeler bu merkeze \u00f6\u011frenci g\u00f6nderebilecek.<\/p>\n<p>10. Karbon kredisi sat\u0131\u015f\u0131<\/p>\n<p>Proje ortaklar\u0131yla karbon piyasas\u0131nda karbon kredisi sat\u0131\u015f\u0131 konusunda g\u00f6r\u00fc\u015fmeler s\u00fcr\u00fcyor.Karbon kredileri, atmosfere sal\u0131nan veya \u00f6nlenen her 1 metrik ton karbondioksit i\u00e7in ticareti yap\u0131labilen birimlere denir.\u015eirketler veya bireyler, emisyonlar\u0131n\u0131 karbon kredisi sat\u0131n alarak dengeleyebilir.<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Musanze B\u00f6lgesi\u2019nde m\u00fclk de\u011ferleme \u00e7al\u0131\u015fmalar\u0131 ba\u015flad\u0131. Bu, Rwanda\u2019n\u0131n ilk b\u00fcy\u00fck \u00f6l\u00e7ekli at\u0131ktan enerji \u00fcretim tesisi i\u00e7in yol a\u00e7\u0131yor. 80 milyon ABD dolar\u0131 (yakla\u015f\u0131k 115 milyar Rwf) de\u011ferindeki proje, \u00e7\u00f6pleri elektri\u011fe d\u00f6n\u00fc\u015ft\u00fcrmeyi, istihdam yaratmay\u0131 ve kirlili\u011fi azaltmay\u0131 hedefliyor. Proje, Waste Power Plant Ltd (WPP) taraf\u0131ndan uygulanacak ve ge\u00e7en hafta proje geli\u015ftiricileri, Musanze B\u00f6lgesi yetkilileri ve di\u011fer &hellip; <a href=\"https:\/\/www.sutyo.com\/tr\/musanze-110-milyar-rwflik-atiktan-enerjiye-donusum-tesisi-hakkinda-bilinmesi-gereken-10-sey\/\" class=\"more-link\">Okumaya devam et<span class=\"screen-reader-text\"> &#8220;Musanze: 110 milyar Rwflik at\u0131ktan enerjiye d\u00f6n\u00fc\u015f\u00fcm tesisi hakk\u0131nda bilinmesi gereken 10 \u015fey&#8221;<\/span><\/a><\/p>","protected":false},"author":1271,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"categories":[393],"tags":[],"class_list":["post-5245","post","type-post","status-publish","format-standard","hentry","category-hayvancilik"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/posts\/5245","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/users\/1271"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/comments?post=5245"}],"version-history":[{"count":0,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/posts\/5245\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/media?parent=5245"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/categories?post=5245"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/tags?post=5245"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}