{"id":3579,"date":"2023-12-27T03:04:28","date_gmt":"2023-12-27T03:04:28","guid":{"rendered":"https:\/\/www.sutyo.com\/koridor-viii-kapsaminda-k-makedonya-kriva-palankadan-bulgaristan-cumhuriyeti-sinirina-kadar-yeni-demiryolu-bolumunun-insaati-2\/"},"modified":"2023-12-27T03:04:28","modified_gmt":"2023-12-27T03:04:28","slug":"koridor-viii-kapsaminda-k-makedonya-kriva-palankadan-bulgaristan-cumhuriyeti-sinirina-kadar-yeni-demiryolu-bolumunun-insaati-2","status":"publish","type":"post","link":"https:\/\/www.sutyo.com\/tr\/koridor-viii-kapsaminda-k-makedonya-kriva-palankadan-bulgaristan-cumhuriyeti-sinirina-kadar-yeni-demiryolu-bolumunun-insaati-2\/","title":{"rendered":"Koridor VIII Kapsam\u0131nda K.Makedonya &#8211; Kriva Palanka&#8217;dan Bulgaristan Cumhuriyeti S\u0131n\u0131r\u0131na Kadar Yeni Demiryolu B\u00f6l\u00fcm\u00fcn\u00fcn \u0130n\u015faat\u0131"},"content":{"rendered":"<div>\n<p>22.12.2023 tarihinde Kuzey Makedonya Maliye Bakanl\u0131\u011f\u0131 Merkezi Finans ve \u0130hale Dairesi Ba\u015fkanl\u0131\u011f\u0131 (CFCD) Koridor VIII kapsam\u0131nda K.Makedonya &#8211; Kriva Palanka&#8217;dan Bulgaristan Cumhuriyeti s\u0131n\u0131r\u0131na kadar yeni demiryolu b\u00f6l\u00fcm\u00fcn\u00fcn in\u015faat\u0131 ihalesi duyurusu yay\u0131nlanm\u0131\u015ft\u0131r.<\/p>\n<p>Yeni demiryolu b\u00f6l\u00fcm\u00fcn\u00fcn 23,4 kilometre uzunlu\u011funda olmas\u0131 ve 22 t\u00fcnel, 52 k\u00f6pr\u00fcn\u00fcn yan\u0131 s\u0131ra Kriva Palanka ve Zhidilovo k\u00f6y\u00fc yak\u0131nlar\u0131ndaki tren istasyonlar\u0131n\u0131 i\u00e7ermesi \u00f6ng\u00f6r\u00fcl\u00fcyor.<\/p>\n<p>G\u00f6revlerin uygulanma s\u00fcresi: 2556 takvim g\u00fcn\u00fc (7 y\u0131l), bunun 1826 takvim g\u00fcn\u00fc (5 y\u0131l) ba\u015flang\u0131\u00e7 tarihinden Devralma Sertifikas\u0131n\u0131n d\u00fczenlenmesine kadard\u0131r; bunu kusur bildirim s\u00fcresi i\u00e7in 730 takvim g\u00fcn\u00fc (2 y\u0131l) takip etmektedir.<\/p>\n<p>Bu ihale prosed\u00fcr\u00fc ve s\u00f6zle\u015fmeye ili\u015fkin t\u00fcm yaz\u0131l\u0131 ileti\u015fimler \u0130ngilizce olmas\u0131 gerekti\u011fi ve adaylar\u0131n ba\u015fvuru formunda sunaca\u011f\u0131 mali verilerin Avro cinsinden tan\u0131mlanmas\u0131 gerekti\u011fi belirtilmi\u015ftir.<\/p>\n<p>\u0130haleyi d\u00fczenleyen kurum 07.03.2024 00:00 Europe\/Skopje tarihi sonras\u0131nda iletilen sorulara cevap vermekle y\u00fck\u00fcml\u00fc de\u011fildir. \u0130hale son ba\u015fvuru tarihi 28.03.2024, ihale tekliflerinin a\u00e7\u0131lmas\u0131 04.04.2024 K. Makedonya Saati ile 11:00\u2019da yap\u0131laca\u011f\u0131 bildirilmi\u015ftir.<\/p>\n<p>\u0130hale ile ilgili ek bilgilere a\u015fa\u011f\u0131da payla\u015f\u0131lm\u0131\u015f olan ba\u011flant\u0131dan ula\u015f\u0131labilmektedir.<\/p>\n<p><a href=\"https:\/\/cfcd.finance.gov.mk\/?page_id=2153\">https:\/\/cfcd.finance.gov.mk\/?page_id=2153<\/a><\/p>\n<p>\u00a0<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>22.12.2023 tarihinde Kuzey Makedonya Maliye Bakanl\u0131\u011f\u0131 Merkezi Finans ve \u0130hale Dairesi Ba\u015fkanl\u0131\u011f\u0131 (CFCD) Koridor VIII kapsam\u0131nda K.Makedonya &#8211; Kriva Palanka&#8217;dan Bulgaristan Cumhuriyeti s\u0131n\u0131r\u0131na kadar yeni demiryolu b\u00f6l\u00fcm\u00fcn\u00fcn in\u015faat\u0131 ihalesi duyurusu yay\u0131nlanm\u0131\u015ft\u0131r. Yeni demiryolu b\u00f6l\u00fcm\u00fcn\u00fcn 23,4 kilometre uzunlu\u011funda olmas\u0131 ve 22 t\u00fcnel, 52 k\u00f6pr\u00fcn\u00fcn yan\u0131 s\u0131ra Kriva Palanka ve Zhidilovo k\u00f6y\u00fc yak\u0131nlar\u0131ndaki tren istasyonlar\u0131n\u0131 i\u00e7ermesi \u00f6ng\u00f6r\u00fcl\u00fcyor. &hellip; <a href=\"https:\/\/www.sutyo.com\/tr\/koridor-viii-kapsaminda-k-makedonya-kriva-palankadan-bulgaristan-cumhuriyeti-sinirina-kadar-yeni-demiryolu-bolumunun-insaati-2\/\" class=\"more-link\">Okumaya devam et<span class=\"screen-reader-text\"> &#8220;Koridor VIII Kapsam\u0131nda K.Makedonya &#8211; Kriva Palanka&#8217;dan Bulgaristan Cumhuriyeti S\u0131n\u0131r\u0131na Kadar Yeni Demiryolu B\u00f6l\u00fcm\u00fcn\u00fcn \u0130n\u015faat\u0131&#8221;<\/span><\/a><\/p>","protected":false},"author":1271,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"categories":[393],"tags":[],"class_list":["post-3579","post","type-post","status-publish","format-standard","hentry","category-hayvancilik"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/posts\/3579","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/users\/1271"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/comments?post=3579"}],"version-history":[{"count":0,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/posts\/3579\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/media?parent=3579"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/categories?post=3579"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/tags?post=3579"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}