{"id":3487,"date":"2023-11-08T03:04:39","date_gmt":"2023-11-08T03:04:39","guid":{"rendered":"https:\/\/www.sutyo.com\/fas-elektrik-ve-icme-suyu-ofisi-elektrik-subesi-oncf-tarafindan-fasin-guneyini-merkeze-baglayan-3gw-kapasiteli-cok-yuksek-gerilim-elektrik-hatti-yapimina-iliskin-bir-ilgililerin-t\/"},"modified":"2023-11-08T03:04:39","modified_gmt":"2023-11-08T03:04:39","slug":"fas-elektrik-ve-icme-suyu-ofisi-elektrik-subesi-oncf-tarafindan-fasin-guneyini-merkeze-baglayan-3gw-kapasiteli-cok-yuksek-gerilim-elektrik-hatti-yapimina-iliskin-bir-ilgililerin-t","status":"publish","type":"post","link":"https:\/\/www.sutyo.com\/tr\/fas-elektrik-ve-icme-suyu-ofisi-elektrik-subesi-oncf-tarafindan-fasin-guneyini-merkeze-baglayan-3gw-kapasiteli-cok-yuksek-gerilim-elektrik-hatti-yapimina-iliskin-bir-ilgililerin-t\/","title":{"rendered":"Fas Elektrik Ve \u0130\u00e7me Suyu Ofisi-Elektrik Subesi (Oncf) Taraf\u0131ndan, Fas\u2019In G\u00fcneyini Merkeze Ba\u011flayan 3Gw Kapasiteli \u00c7ok Y\u00fcksek Gerilim Elektrik Hatt\u0131 Yap\u0131m\u0131na \u0130li\u015fkin Bir \u201c\u0130lgililerin Tespiti \u0130halesi\u201d A\u00e7\u0131ld\u0131"},"content":{"rendered":"<div>\n<p>Fas Elektrik ve \u0130\u00e7me Suyu Ofisi-Elektrik Subesi (ONCF) taraf\u0131ndan, Fas\u2019\u0131n g\u00fcneyini merkeze ba\u011flayan 3GW kapasiteli \u00e7ok y\u00fcksek gerilim elektrik hatt\u0131 yap\u0131m\u0131na ili\u015fkin bir \u201c\u0130lgililerin Tespiti \u0130halesi\u201d a\u00e7\u0131lm\u0131\u015ft\u0131r. Ad\u0131 ge\u00e7en i\u015fveren kurumunun, projenin geli\u015ftirilmesi, tasar\u0131m\u0131, finansman\u0131, in\u015faat\u0131, i\u015fletimi ve bak\u0131m\u0131 i\u00e7in bir konsorsiyumla s\u00f6zle\u015fme yapmay\u0131 planlad\u0131\u011f\u0131 belirtilmektedir.<\/p>\n<p>Ofis taraf\u0131ndan a\u00e7\u0131klanan ihale duyurusunda, projenin, a\u015fa\u011f\u0131daki gibi iki a\u015famada ger\u00e7ekle\u015ftirilece\u011fi bildirilmi\u015ftir:<\/p>\n<p>-1.faz: 2026 y\u0131l\u0131nda devreye al\u0131naca\u011f\u0131 1500 MW kapasiteli G\u00fcneyi Merkeze ba\u011flayan elektrik hatt\u0131 yap\u0131m\u0131<\/p>\n<p>-2.faz: 2028 y\u0131l\u0131nda devreye al\u0131naca\u011f\u0131 1500 MW ek kapasite ile G\u00fcneyi Merkeze ba\u011flayan elektrik hatt\u0131 yap\u0131m\u0131<\/p>\n<p>Duyuruda, aday\u0131n (\u015firketler grubu), 3000 MW elektrik kapasitesi ile do\u011fru ak\u0131m (HVDC) veya alternatif ak\u0131ma (HVAC) dayal\u0131 herhangi bir \u00e7\u00f6z\u00fcm \u00f6nerebilece\u011fi; projeyi ger\u00e7ekle\u015ftirmek i\u00e7in, \u00f6nerilen \u00e7\u00f6z\u00fcm\u00fcn en az benzer bir teknoloji kurulumunu i\u015fletmi\u015f olan <strong>bir elektrik sistemi operat\u00f6r\u00fc<\/strong> ile y\u00fcksek ve \u00e7ok y\u00fcksek gerilim enerji ta\u015f\u0131mac\u0131l\u0131\u011f\u0131 alanlar\u0131nda referanslar\u0131na sahip olan bir <strong>referans \u00fcreticiden<\/strong> olu\u015fan bir \u015firketler grubu Projenin geli\u015ftirilmesi, tasar\u0131m\u0131, finansman\u0131, in\u015fas\u0131, i\u015fletilmesi ve bak\u0131m\u0131 i\u00e7in gerekli teknik ve mali kapasitelerine sahip olmas\u0131 gerekti\u011fi bildirilmi\u015ftir.<\/p>\n<p>Aday se\u00e7imi (\u015firketler grubu), a\u015fa\u011f\u0131daki s\u00fcrece g\u00f6re yap\u0131lacakt\u0131r:<\/p>\n<p>1.A\u015fama: \u00d6n yeterlili\u011fin k\u0131sa listesinin se\u00e7imi<\/p>\n<p>2.A\u015fama: ilk a\u015famada se\u00e7ilen \u00f6n yeterlili\u011fi kazananlar aras\u0131ndan tek bir aday\u0131n se\u00e7ilmesi<\/p>\n<p>Projenin geli\u015ftiricisinin, Fas yasalar\u0131na g\u00f6re projeyi \u00fcstlenecek bir proje \u015firketi kurmas\u0131 gerekti\u011fi bildirilmi\u015ftir.<\/p>\n<p>Projenin ger\u00e7ekle\u015ftirilmesine ili\u015fkin ihalenin sonu\u00e7land\u0131r\u0131lma s\u00fcreci a\u015fa\u011f\u0131daki gibi planlanm\u0131\u015ft\u0131r:<\/p>\n<p>31 Ekim: \u0130halenin a\u00e7\u0131l\u0131\u015f\u0131<\/p>\n<p>31 Ocak 2024: Ba\u015fvuru dosyalar\u0131n\u0131n a\u00e7\u0131l\u0131\u015f tarihi<\/p>\n<p>29 \u015eubat 2024: Adaylar\u0131n \u00f6n yeterlili\u011fi<\/p>\n<p>2024 y\u0131l\u0131n\u0131n ikinci yar\u0131s\u0131: Aday\u0131n se\u00e7imi<\/p>\n<p>\u0130\u015fbu \u201c\u0130lgililerin Tespiti \u0130halesi\u201d\u2019ne ili\u015fkin herhangi bilgi talebinin elomari@onee.ma e-posta adresine en ge\u00e7, ba\u015fvuru son tarihinden 15 g\u00fcn \u00f6nce iletilebilece\u011fi bildirilmi\u015ftir.<\/p>\n<p>Adaylar\u0131n, ba\u015fvuru zarflar\u0131n\u0131, \u201cMonsieur le Pr\u00e9sident de la Commission Interminist\u00e9rielle de Jugement de l\u2019ONEE-BE\u201d dikkatine iletmesi gerekti\u011fi;\u00a0 ba\u015fvuru dosyalar\u0131n\u0131n, \u201cOffice National de l\u2019Electricit\u00e9 et de l\u2019Eau Potable-Branche Electricit\u00e9 Direction Approvisionnements et March\u00e9s \u201cDAM\u201d, 65 Rue Othman Ben Affan Casablanca Maroc\u201d adresine taahh\u00fctl\u00fc posta yoluyla g\u00f6nderilebilece\u011fi veya teslim al\u0131nd\u0131 belgesi kar\u015f\u0131l\u0131\u011f\u0131nda ba\u015fvuru dosyalar\u0131n\u0131n teslim b\u00fcrosuna teslim edilebilece\u011fi veya ba\u015fvuru zarflar\u0131n\u0131n a\u00e7\u0131laca\u011f\u0131 g\u00fcn zarflar a\u00e7\u0131lmadan \u00f6nce ihale komisyon ba\u015fkan\u0131na teslim edilebilece\u011fi; ba\u015fvurular\u0131n<strong> 31 Ocak 2024 saat 10:00\u2019a<\/strong> <strong>(Yerel saat) kadar<\/strong> teslim al\u0131naca\u011f\u0131 hususlar\u0131na yer verilmi\u015ftir.<\/p>\n<p>Bu ba\u011flamda, yukar\u0131da \u00f6zet bilgilerine yer verilen ihale duyurusuna ekte yer verilmi\u015f olup s\u00f6z konusu ihalenin dok\u00fcman\u0131n\u0131n a\u015fa\u011f\u0131daki ba\u011flant\u0131dan indirilmesi m\u00fcmk\u00fcnd\u00fcr:<\/p>\n<p>https:\/\/www.marchespublics.gov.ma\/index.php?page=entreprise.EntrepriseDetailsConsultation&#038;refConsultation=750979&#038;orgAcronyme=d4q<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Fas Elektrik ve \u0130\u00e7me Suyu Ofisi-Elektrik Subesi (ONCF) taraf\u0131ndan, Fas\u2019\u0131n g\u00fcneyini merkeze ba\u011flayan 3GW kapasiteli \u00e7ok y\u00fcksek gerilim elektrik hatt\u0131 yap\u0131m\u0131na ili\u015fkin bir \u201c\u0130lgililerin Tespiti \u0130halesi\u201d a\u00e7\u0131lm\u0131\u015ft\u0131r. Ad\u0131 ge\u00e7en i\u015fveren kurumunun, projenin geli\u015ftirilmesi, tasar\u0131m\u0131, finansman\u0131, in\u015faat\u0131, i\u015fletimi ve bak\u0131m\u0131 i\u00e7in bir konsorsiyumla s\u00f6zle\u015fme yapmay\u0131 planlad\u0131\u011f\u0131 belirtilmektedir. Ofis taraf\u0131ndan a\u00e7\u0131klanan ihale duyurusunda, projenin, a\u015fa\u011f\u0131daki gibi iki &hellip; <a href=\"https:\/\/www.sutyo.com\/tr\/fas-elektrik-ve-icme-suyu-ofisi-elektrik-subesi-oncf-tarafindan-fasin-guneyini-merkeze-baglayan-3gw-kapasiteli-cok-yuksek-gerilim-elektrik-hatti-yapimina-iliskin-bir-ilgililerin-t\/\" class=\"more-link\">Okumaya devam et<span class=\"screen-reader-text\"> &#8220;Fas Elektrik Ve \u0130\u00e7me Suyu Ofisi-Elektrik Subesi (Oncf) Taraf\u0131ndan, Fas\u2019In G\u00fcneyini Merkeze Ba\u011flayan 3Gw Kapasiteli \u00c7ok Y\u00fcksek Gerilim Elektrik Hatt\u0131 Yap\u0131m\u0131na \u0130li\u015fkin Bir \u201c\u0130lgililerin Tespiti \u0130halesi\u201d A\u00e7\u0131ld\u0131&#8221;<\/span><\/a><\/p>","protected":false},"author":1271,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"categories":[393],"tags":[],"class_list":["post-3487","post","type-post","status-publish","format-standard","hentry","category-hayvancilik"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/posts\/3487","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/users\/1271"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/comments?post=3487"}],"version-history":[{"count":0,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/posts\/3487\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/media?parent=3487"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/categories?post=3487"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/tags?post=3487"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}