{"id":3297,"date":"2023-07-26T03:00:23","date_gmt":"2023-07-26T03:00:23","guid":{"rendered":"https:\/\/www.sutyo.com\/almanyada-ruzgar-enerjisi-yayginlastiriliyor\/"},"modified":"2023-07-26T03:00:23","modified_gmt":"2023-07-26T03:00:23","slug":"almanyada-ruzgar-enerjisi-yayginlastiriliyor","status":"publish","type":"post","link":"https:\/\/www.sutyo.com\/tr\/almanyada-ruzgar-enerjisi-yayginlastiriliyor\/","title":{"rendered":"Almanya\u2019da R\u00fczgar Enerjisi Yayg\u0131nla\u015ft\u0131r\u0131l\u0131yor"},"content":{"rendered":"<div>\n<p>Federal H\u00fck\u00fcmetin ald\u0131\u011f\u0131 karar \u00e7er\u00e7evesinde Almanya&#8217;da her y\u0131l y\u00fczlerce 10 gigawatt kapasiteli r\u00fczgar t\u00fcrbininin kurulmas\u0131 hedefleniyor. 01 \u015eubat 2023 tarihinde y\u00fcr\u00fcrl\u00fc\u011fe giren \u2018Karada R\u00fczgar Yasas\u0131 (Wind-an-Land-Gesetz) ile bu konuda planlama ve onay prosed\u00fcrlerinin h\u0131zland\u0131r\u0131lmas\u0131 ama\u00e7lan\u0131yor.<\/p>\n<p>2023&#8217;\u00fcn ilk yar\u0131s\u0131nda Almanya&#8217;da toplam kapasitesi 1,56 gigawatt olan 331 yeni r\u00fczgar t\u00fcrbini kuruldu. Federal R\u00fczgar Enerjisi Birli\u011fi s\u00f6zc\u00fcs\u00fc Frank Gr\u00fcneisen, bu say\u0131n\u0131n 2022 y\u0131l\u0131na g\u00f6re daha fazla oldu\u011funu, ancak yine de Federal H\u00fck\u00fcmet taraf\u0131ndan belirlenen hedeflere ula\u015fmak i\u00e7in yetersiz oldu\u011funu belirtmi\u015ftir. Ayr\u0131ca \u00f6n\u00fcm\u00fczdeki s\u00fcre\u00e7te arazi temininden ba\u015flayarak, \u00e7ok uzun onay prosed\u00fcrleri ve projelerin ihale s\u00fcre\u00e7lerinin uzamas\u0131 gibi bir \u00e7ok sorun ile kar\u015f\u0131 kar\u015f\u0131ya kal\u0131nabilece\u011fi ifade edilmektedir. \u00a0Ortalama olarak, bir r\u00fczgar t\u00fcrbininin in\u015fas\u0131, yap\u0131lan ilk ba\u015fvurudan itibaren \u00fcretilen ilk kilovat saat elektri\u011fe kadar be\u015f ila yedi y\u0131l aras\u0131nda s\u00fcrmektedir. Bununla birlikte, son zamanlarda nakliye izinlerinin de giderek artan bir sorun haline geldi\u011fi belirtilmektedir. Gr\u00fcneisen\u2019\u0131n a\u00e7\u0131klamalar\u0131na g\u00f6re, sadece \u015fu an bekleyen 15.000 ba\u015fvuru bulunmakta. Belirtilen sorunlar d\u0131\u015f\u0131nda, pek \u00e7ok b\u00f6lgede r\u00fczgar santrali projeleri yerel halk\u0131n direni\u015fiyle de kar\u015f\u0131la\u015fmakta ancak halk\u0131 ikna edici unsurlar ile baz\u0131 projeler hayata ge\u00e7irilebilmektedir.\u00a0<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Federal H\u00fck\u00fcmetin ald\u0131\u011f\u0131 karar \u00e7er\u00e7evesinde Almanya&#8217;da her y\u0131l y\u00fczlerce 10 gigawatt kapasiteli r\u00fczgar t\u00fcrbininin kurulmas\u0131 hedefleniyor. 01 \u015eubat 2023 tarihinde y\u00fcr\u00fcrl\u00fc\u011fe giren \u2018Karada R\u00fczgar Yasas\u0131 (Wind-an-Land-Gesetz) ile bu konuda planlama ve onay prosed\u00fcrlerinin h\u0131zland\u0131r\u0131lmas\u0131 ama\u00e7lan\u0131yor. 2023&#8217;\u00fcn ilk yar\u0131s\u0131nda Almanya&#8217;da toplam kapasitesi 1,56 gigawatt olan 331 yeni r\u00fczgar t\u00fcrbini kuruldu. Federal R\u00fczgar Enerjisi Birli\u011fi s\u00f6zc\u00fcs\u00fc Frank &hellip; <a href=\"https:\/\/www.sutyo.com\/tr\/almanyada-ruzgar-enerjisi-yayginlastiriliyor\/\" class=\"more-link\">Okumaya devam et<span class=\"screen-reader-text\"> &#8220;Almanya\u2019da R\u00fczgar Enerjisi Yayg\u0131nla\u015ft\u0131r\u0131l\u0131yor&#8221;<\/span><\/a><\/p>","protected":false},"author":1271,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"categories":[393],"tags":[],"class_list":["post-3297","post","type-post","status-publish","format-standard","hentry","category-hayvancilik"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/posts\/3297","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/users\/1271"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/comments?post=3297"}],"version-history":[{"count":0,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/posts\/3297\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/media?parent=3297"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/categories?post=3297"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sutyo.com\/tr\/wp-json\/wp\/v2\/tags?post=3297"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}